Modern Architecture

PARK STREET ESTATE COMPLEX - OAKLANDS, JOHANNESBURG

Our latest project in Oakland, Johannesburg, consisted of 2 large 2 story unit blocks, plus pool and recreation area. It also consisted of closed in garages and numerous carports. A project that took us 14 months to fully complete, due to severe and deteriorated plaster repairs

20201021_103038_resized.jpg
Modern Architecture
Start of painting east end.jpg

Phase 1

North Block

Our guys at work doing the preparation work and refurbishment to exterior walls.

Phase 2

Common Property

The carports were a project that consisted of the Chromodek sheeting removal, rust proofing of all beams and complete re-paint. All sheeting was replaced, and cleaned.

IMG-20210805-WA0004.jpg
20210806_100655_resized.jpg

Phase 3

Southern Block

The Southern block was the same process followed as the North block, and the end result was impressive and all accolades to my team

Modern Architecture

COMPLEX COMPLETION

The end result. An upmarket complex fully restored. Our work was monitored by CURASURE, weekly to ensure all quality measures were adhered to

20220204_093710_resized_1_edited.jpg
Park Street Estate.jpg
20201021_105752_resized.jpg